SEDEX, ISO 9001-2015, ISO 14001-2015, GMP, CE 1194
Probe zeit
3-4 tage
Lieferung zeit
4-5 tage
Verpackung und Lieferung
Details zur Verpackung
Products are properly packed in a single pp bag and again those packages are packed in the cargo box. We do the packing also as per the customer requirements.
Hafen
International Sea Port: Kolkata / International Air Port: Tribhuvan International Air port