Stahl Grade
301L, 301, 310S, 410, 316Ti, 316, 430, 304, 304L
Ursprungsort
Shandong, China
Lieferzeit
Innerhalb 7 tage
Bescheinigung
API, Ce, BIS, GS, ISO9001
Verarbeitung Service
Schweißen, Stanzen, Schneiden, Biegen, Abwickeln
Delivery Time
in Stock: 5-10 Days, Not in Stock: 10-20 Days
Transport Package
Standard Export Package
Manufacturing Method
Cold Rolled, Hot Rolled
Treatment
Corrugated, Perforated, Embossed, Etched, Water Ri
Surface
No.1, 2b, Ba, 8K, No.4, Hairline, Sandblasting
Production Capacity
500000 Tons/Month